Tsawwassen First Nation Elders Centre

TSAWWASSEN, BC

The Tsawwassen Elders Centre comprises a two-storey building located along Tsawwassen Drive just south of Blue Heron Way within the TFN lands. The building serves as a place where the Elders can gather to socialize and participate in various activities. The building has a gross floor area of

approximately 10,000ft2 and has a structure to meet post-disaster requirements.

STATUS

Completed

SECTOR

First Nations Recreational Facility

SERVICES

Cost Planning and Value Engineering

DEVELOPER

Tsawwassen First Nation

Bernard Block

KELOWNA, BC

The Bernard Block is a large mixed-use commercial and residential development in downtown Kelowna. The project comprises a 35-storey high-rise condominium tower and 17-storey office tower with a shared parkade/podium spanning a full city block. The total gross floor area of the project is approximately 509,000ft2, and the condominium tower includes a total of 257 units.

STATUS

Under Construction

SECTOR

Residential / Commercial

SERVICES

Cost Planning and Project Monitoring

VALUE

$167M

DEVELOPER

Aqua Waterfront Village

KELOWNA,BC

Aqua Waterfront Village is a large mixed-use residential and commercial development located along the shore of Okanagan Lake in the Lower Mission area of Kelowna. The project comprises three condominium towers ranging in height from 13 to 17-storeys with a total of 415 units, situated above a shared parkade / podium with ground floor commercial retail units. The Aqua Boat Club also forms part of the development with a large indoor boat storage facility and ground floor commercial / retail units. The total gross floor area of the combined three condominium towers, parkade / podium, and boat storage facility is approximately 772,000ft2.

STATUS

Under Construction

SECTOR

Residential / Commercial

SERVICES

Cost Planning and Project Monitoring

VALUE

$418M

DEVELOPER

Sole Cawston

KELOWNA, BC

Situated in the north end of downtown Kelowna, Sole Cawston is a six-storey mixed use commercial and residential development with a gross floor area of approximately 80,000ft2. The building includes three floors of parkade and commercial space comprising four live-work townhomes and a 12,000ft2 school, with a further three floors of residential space containing 45 condominium units.

STATUS

Under Construction

SECTOR

Residential / Commercial

SERVICES

Cost Planning and Project Monitoring

VALUE

$27M

DEVELOPER

Royal Inland Hospital,

Patient Care Tower

KAMLOOPS, BC

The Patient Care Tower is a new nine storey building with roof top helipad constructed over a two-storey parkade. The Patient Care Tower has a gross floor area of approximately 295,000ft2. The project includes a new surgical suite, medical surgical beds, perinatal centre with private delivery rooms, obstetrics and postpartum beds, a neonatal intensive care unit, mental health program, and administrative support spaces.

STATUS

Completed Spring 2022

SECTOR

Healthcare

SERVICES

Cost Planning

VALUE

$417M

DEVELOPER

Interior Health Authority

ELLA

KELOWNA, BC

Project Details


Situated on the corner of Lawrence Avenue and Ellis Street in downtown Kelowna, ELLA is a 20-storey luxury condominium tower with ground floor commercial units and a gross floor area of approximately 203,000ft2. The building includes one floor of commercial/retail space, four levels of parkade, and 15 residential floors above the podium with a total of 116 condominium units.

STATUS

Completed Spring 2020

SECTOR

Residential / Commercial

SERVICES

Project Monitoring

VALUE

$63M

DEVELOPER

Brooklyn

KELOWNA. BC

Project Details


Brooklyn is a 25-storey high-rise residential and commercial tower located next to the Bernard Block in downtown Kelowna. The mixed-use building has a gross floor area of approximately 243,000ft2, with ground floor commercial / retail units and visitor parking, four levels of parkade, and 20 residential floors above the podium with a total of 178 condominium units.

STATUS

Completed Spring 2022

SECTOR

Residential / Commercial

SERVICES

Project Monitoring

VALUE

$76M

DEVELOPER

Sole Rutland

KELOWNA, BC

Project Details


Sole Rutland is a five-storey mixed commercial and residential development located in the Rutland community of Kelowna. The mixed-use building has a gross floor area of approximately 79,000ft2, with one level of underground parking, commercial space on the main floor, and four residential floors above the podium with a total of 56 condominium units.

STATUS

Completed Spring 2022

SECTOR

Residential / Commercial

SERVICES

Cost Planning and Project Monitoring

VALUE

$21M

DEVELOPER

Cariboo Memorial Hospital Redevelopment

WILLIAMS LAKE, BC

Project Details


Major redevelopment to the Cariboo Memorial Hospital comprising a five-storey addition to the existing facility, with a gross floor area of approximately 100,000ft2. The project includes 44 medical surgical beds for the inpatient and maternity units, new emergency department, new pharmacy, redeveloped main entrance and administration space.

STATUS

Under Construction

SECTOR

Healthcare

SERVICES

Cost Planning

VALUE

$260M

DEVELOPER

Interior Health Authority

Ambulance Station

REVELSTOKE, BC

Project Details


Situated in the city of Revelstoke, this emergency services facility was completed in 2012 by the British Columbia Ambulance Service.The facility included a two bay ambulance garage, as well as support services and administration spaces for the ambulance crew.

STATUS

Completed in 2012

SECTOR

Healthcare

SERVICES

Cost Planning & Estimating

VALUE

XXXXX

DEVELOPER

British Columbia Ambulance Service

Custom Home, Sheerwater Development

KELOWNA, BC

Project Details


This Tommie Award winning home is situated in the prestigious Sheerwater Lake Front Development, Kelowna, BC. The contemporary design includes a mixture of concrete, heavy timber and extensive fenestrations, which complement the magnificent setting overlooking Okanagan Lake.

STATUS

Completed

SECTOR

Residential

SERVICES

Cost Planning & Mortgage Monitoring

VALUE

XXXXX

DEVELOPER

XXXXX

Kensington Terrace Townhouse Development

KELOWNA, BC

Project Details


This stylish eight-unit townhouse development is situated in the heart of Kelowna’s downtown neighborhood. Completed in the summer of 2014, the luxury four storey townhomes all include a large roof top terrace, providing an area for patio seating, an outdoor kitchen and hot tub.

STATUS

Completed in 2014

SECTOR

Residential

SERVICES

Mortgage Monitoring

VALUE

XXXXX

DEVELOPER

Steve Hyndman

Sheraton Four Points Hotel

KELOWNA, BC

Project Details


Situated on Airport Way, across from the Kelowna International Airport, the Four Points Hotel by Sheraton was completed in the summer of 2013 by Argus Properties Ltd.The project included 120 guest rooms, an indoor pool, fitness area, dining area, restaurant, conference centre, and extensive exterior patios.

STATUS

Completed in 2013

SECTOR

Commercial

SERVICES

Mortgage Monitoring

VALUE

XXXXX

DEVELOPER

Argus Properties Ltd

Peter Hildebrand

Principal, Iredale Architecture


“We have had the pleasure of working with the LTA team for the past 10 years. In that time, we have found that they are consistently accurate, on time and a pleasure to deal with in helping us gain a thorough understanding of the project’s budget and costing parameters. Their Costing analysis & Quantity Surveying is always extremely thorough, on time and budget. We have been very satisfied with the projects we have worked on together and will continue to engage LTA for future projects.”

Mike Azhadi

Proprietor, Azhadi Vineyards


“LTA Consultants Inc. have been a valuable partner in the development of Azhadi Vineyards. They remained fully responsive throughout both the design and construction phases and are still supportive with current developments as they occur in this major undertaking. They stayed closely connected with our design and construction teams and were always available whenever a question arose.  Their adaptive approach allowed them to quickly pivot and offer practical solutions as the project evolved.

Most importantly, they proved to be reliable-consistently providing accurate estimates and clear guidance that helped keep us and our project on track!”

Kevin Edgecombe

Owner and President,

Edgecombe Builders Group

“As our goal is to overplease our clients on their development projects, we choose to work with fellow highly qualified professionals to attain these goals.

The LTA team are qualified & proven Quantity Surveyors who are experts in their field. They are highly proficient and work very well with the team at Edgecombe Builders and Live Edge Okanagan Builders.”

Shelley Craig

Principal,

Urban Arts Architecture Inc.


“UAA has recently worked with Lyndon on the Summerland Library. The project was a fast track construction management contract, and Lyndon’s input was invaluable throughout the design process to establish design direction, look at cost savings and ultimately realize a stunning new building from design to occupation in 15 months.

We look forward to working with Lyndon again. Lyndon is a great team player and committed to excellence in his work and relationships with clients and colleagues.”

Keith Davidoff

Senior Manager,

Strategic Planning & Projects BC Emergency Health Services Provincial Health Services Authority


“LTA Consultants has provided BCEHS with exceptional service over the years. Their responsiveness to deadlines is impressive! Their ability to provide Quantity Surveying is excellent and I feel that LTA Consultants goes above and beyond in providing special reporting on an as requested basis.

I would not hesitate in recommending LTA Consultants to anyone looking for Quantity Surveying consulting.”

Justin Allaire

Associate Director Project Services | Infrastructure Development,

The University of British Columbia, Okanagan Campus



“I have had the opportunity to collaborate with Lyndon, both as a consulting mechanical engineer and more recently as an owner’s representative for a public institution. He always demonstrates professionalism and competence in his line of work.

Lyndon operates in a transparent and efficient manner and has the ability to address audiences of both technical and non-technical backgrounds. This permits him to integrate well into design and planning teams of various sizes and composition, at any stage of the process. The LTA team’s diligence in understanding desired project outcomes and proposed solutions is evidence of their shared interest in the success of every project they undertake. We look forward to working with LTA on future projects.”


Wade Steele

Business Relationship Manager & Associate Director,

Prospera Credit Union

“Having a mortgage monitoring company to work with us that we can trust is paramount to our clients and our organization, as their work ethic and sense of detail must echo our corporate needs. LTA Consultants Inc. has proven time and time again that we can trust their professional expertise on every project every time.”

Chris Greenway

Senior Relationship Manager,

Commercial Banking,

Canadian Western Bank

“Lyndon and the LTA team have been our go to Construction Financing Cost Consultant, and each time we work with them, we are pleased with the accuracy of results in each project and how quickly they react to our needs. We would recommend working with LTA to any company in need of a reliable, well organised, thorough group of professionals.”

Jamey Trewartha

Regional Manager,

Commercial Banking,

Valley First a division of First West Credit Union

“The Commercial Banking group at Valley First, a Division of First West Credit Union, have been dealing with Lyndon & Brent at LTA Consultants Ltd. for over 10 years. Assignments of varying complexity have been carried out in a prompt and professional manner, providing us with the information we require in order to address our member needs. Brent & Lyndon are highly respected by many of our members, who request that we utilize LTA Consultants Ltd. for our Quantity Survey requirements.”